Monday, September 21, 2009

Light Cover Problem Fixed

A woker arrived around 9:45 am today. And fixed the light cover while I was busy clearing out the room so they could do work on our wall, I asked the worker how he solved the problem. He said that he brought the base down and that it was easy after that.


Smooth clean ceiling with light and cover.

Well it looks like the bathroom is done, but the worker said that Frank still wants to check for leaks or something. But there are no leaks in our bathroom going down. I am assuming the Frank took care of all the ones above us. That is the impression I got from Didio and I am guessing that Delorbe wouldn't continue the construction on our ceiling if their were more leaks above us.

In the meantime I am waiting for them to do the work on the wall which will hopefully be done by today since I start work tomorrow.

No comments:

Post a Comment